- February 2, 2021
This was a part 2 of the job task from water leak damage. Remove old existing wooden floor, replace damage floor board and install new laminate flooring.
This was a part 2 of the job task from water leak damage. Remove old existing wooden floor, replace damage floor board and install new laminate flooring.